Work in Progress
Tier 10
Petropavlovsk
Ussr Cruiser
After Nikolay Kuznetsov was removed from the post of the People's Commissar of the Navy in January 1947, the terms of reference for the construction of a Project 82 cruiser were edited numerous times. Two draft designs were presented in August 1947, and later, they were combined. The joint project had 220 mm main battery guns, higher speed, and lower displacement. This project was a tactically advantageous solution: One of the ship's main tasks was to oppose the U.S. Des Moines-class heavy cruisers.
20,000,000 Credits
Overview
Survivability
Hit Points
55800
Armor Protection
74%
Torpedo Damage Reduction
19%
Maneuverability
Maximum Speed
32.5 knots
Turning Radius
990 m
Rudder Shift Time
12.1 s
Concealment
Surface Detectability
16.3 km
Air Detectability
9.7 km
Submarine Detectability
9.7 km
Weaponry Effectiveness
Artillery
79%
AA Defense
83%
Armor & Protection
Citadel
-1 mm
Casemate
-1 mm
Deck
-1 mm
Extremities
-1 mm
Belt
16 - 300 mm
Torpedo Protection
Damage Reduction
19%
Flooding Risk Reduction
N/A%
Armament
Main Battery
Range
18.4 km
Reload Time
14.0 s
Rate of Fire
4.3 rpm
180° Rotation Time
38.3 s
Max Dispersion
190 m
Shell Types
Type
Damage
Velocity
m/s
Type
Damage
Velocity
m/s
Secondary Battery
Range
7.3 km
Anti-Aircraft Defense
Defense Rating
83
Modules & Upgrades
Hull Configuration
Main Turrets
3
Secondary Turrets
6
Torpedo Tubes
0
AA Mounts
12
Available Modules
Engine
1 available
Hull
1 available
Artillery
1 available
Fire_control
1 available
Research Tree
1 ship(s) can be researched from this vessel.