Work in Progress
Tier 6

Ernst Gaede

Germany Destroyer

In 1933, the construction of flotilla destroyers began, and it was planned for them to surpass their same-type counterparts owned by other nations in speed and firepower. In March 1933, AG Vulcan Stettin released a design proposal for a "conventional London Naval Treaty" destroyer featuring a displacement of 1,500 tons. Later, the project underwent revisions, resulting in an increased displacement of 2,000 tons. Nevertheless, the Kriegsmarine leadership favored an alternative project, which served as the basis for the subsequent development of the Type 1934 ships.

2,990,000 Credits
15700 Hit Points
36.0 kts Max Speed
9.9 km Gun Range
7.3 km Detection
7.5 km Torpedo Range
Overview

Survivability

Hit Points 15700
Armor Protection 24%
Torpedo Damage Reduction 0%

Maneuverability

Maximum Speed 36.0 knots
Turning Radius 690 m
Rudder Shift Time 5.6 s

Concealment

Surface Detectability 7.3 km
Air Detectability 3.4 km
Submarine Detectability 3.4 km

Weaponry Effectiveness

Artillery 53%
Torpedoes 18%
AA Defense 28%
Armor & Protection
Citadel
-1 mm
Casemate
-1 mm
Deck
-1 mm
Extremities
-1 mm
Belt
10 - 16 mm

Torpedo Protection

Damage Reduction 0%
Flooding Risk Reduction N/A%
Armament

Main Battery

Range 9.9 km
Reload Time 5.0 s
Rate of Fire 11.7 rpm
180° Rotation Time 22.5 s
Max Dispersion 89 m
Shell Types
Type
Damage
Velocity m/s
Type
Damage
Velocity m/s

Secondary Battery

Range 0.0 km

Torpedo Armament

Range 7.5 km
Reload Time 90 s
Maximum Damage 13700
Torpedo Speed 62 knots
Detectability 1.3 km
Type G7a T1

Anti-Aircraft Defense

Defense Rating 28

Depth Charges

Maximum Damage 2400
Maximum Packs 2
Bombs per Pack 8
Reload Time 40.0 s
Modules & Upgrades

Hull Configuration

Main Turrets 4
Secondary Turrets 0
Torpedo Tubes 2
AA Mounts 10

Available Modules

Engine
1 available
Hull
2 available
Artillery
2 available
Torpedoes
2 available
Fire_control
2 available

Research Tree

3 ship(s) can be researched from this vessel.

Back to Database All Destroyers