Work in Progress
Tier 8

Kiev

Ussr Destroyer

The performance specifications for a Project 48 leader, derived from Project 1 and Project 38, were approved in 1938. The draft and technical designs were approved in 1939. The lead ship, Kiev, was launched in 1940. After the Axis invasion, construction work on Kiev and Yerevan was halted. The hulls were towed to Sevastopol and then to Batumi. The ships were intended to be completed under the revised Project 48K in the post-war period, but they were eventually canceled.

8,800,000 Credits
16200 Hit Points
42.5 kts Max Speed
11.1 km Gun Range
8.5 km Detection
7.0 km Torpedo Range
Overview

Survivability

Hit Points 16200
Armor Protection 28%
Torpedo Damage Reduction 0%

Maneuverability

Maximum Speed 42.5 knots
Turning Radius 690 m
Rudder Shift Time 6.7 s

Concealment

Surface Detectability 8.5 km
Air Detectability 3.9 km
Submarine Detectability 3.9 km

Weaponry Effectiveness

Artillery 58%
Torpedoes 18%
AA Defense 35%
Armor & Protection
Citadel
-1 mm
Casemate
-1 mm
Deck
-1 mm
Extremities
-1 mm
Belt
13 - 20 mm

Torpedo Protection

Damage Reduction 0%
Flooding Risk Reduction N/A%
Armament

Main Battery

Range 11.1 km
Reload Time 5.0 s
Rate of Fire 12.0 rpm
180° Rotation Time 12.0 s
Max Dispersion 98 m
Shell Types
Type
Damage
Velocity m/s
Type
Damage
Velocity m/s

Secondary Battery

Range 0.0 km

Torpedo Armament

Range 7.0 km
Reload Time 123 s
Maximum Damage 14400
Torpedo Speed 60 knots
Detectability 1.2 km
Type 53-39 mod. 5

Anti-Aircraft Defense

Defense Rating 35

Depth Charges

Maximum Damage 2400
Maximum Packs 2
Bombs per Pack 12
Reload Time 40.0 s
Modules & Upgrades

Hull Configuration

Main Turrets 3
Secondary Turrets 0
Torpedo Tubes 2
AA Mounts 10

Available Modules

Engine
1 available
Hull
2 available
Artillery
1 available
Torpedoes
2 available
Fire_control
2 available

Research Tree

1 ship(s) can be researched from this vessel.

Back to Database All Destroyers